A consultant hired by Edison concludes in a report that it is too \”risky\” for Edison to bring the plant to full power for more than 11 months, and that doing so may cause additional damage to the plant.
A consultant hired by Edison concludes in a report that it is too \”risky\” for Edison to bring the plant to full power for more than 11 months, and that doing so may cause additional damage to the plant.